Skip to Content

7.5 Commuter Rail System

up
846 users have liked.

7.5 COMMUTER RAIL SYSTEM (CRS)
Within the BMA, approximately 120 km of rail system of the Indian Railways exists basically for long distance passengers and goods/ freight. This system currently is not being utilized for intra-urban movement with in the BMA. However RITES in its study has identified some of the Railway corridors along which it is possible to run commuter service with some additions and improvements. A similar proposal of utilizing approximately 62 km track and incurring an expenditure of Rs. 650 Crore on making the commuter service possible in two phases (2007 to 2012 & 2013 to 2018 each estimated to cost Rs. 325 Cr.) has been recommended in M.P.2015. The plan has also indicated a land requirement of 62 Ha. for this project. However it is found that the network proposed above will not be sufficient to meet requirements of the Development Area proposed in Master Plan 2015 upto the year 2025. Accordingly it has been considered necessary to extend the CRS network to approximately 119 Kms, using the existing at-grade railway system to serve intra-city needs, which is proposed along the corridors 1 to 7 in Table 7.4.

In addition, with the coming up of the BMRDA’s planned new Town Ships at Bidadi, Ramanagaram, Solur, Sathanur & Nandagudi, high level of commutation between them and the Metropolis. Also, with the development of the huge Multiple Economic Activity Areas like Electronic City, I.T. Parks, Industrial & Commercial Areas with consequent job opportunities on the one hand and availability of comparatively cheaper accommodation in surrounding towns like Hosur, Ramanagaram and Tumkur etc. where a large number of working population is likely to live, substantial of commuter movement between these towns and the Metropolis will take place. In order to cater to this suburban commuter traffic, the CRS is proposed to be extended as corridors 8 to 10 in Table 7.4 below.

Table 7.4 Commuter Rail Corridors

SNo.

Corridor Length

Kms

1.

Kengeri - Banglore City Station

13.0

2.

Bangalore City Station - Whitefield

24.0

3.

Bangalore City Station – Baiyyappanahalli Via Lottegollahalli

23.0

4.

Lottegollahalli to Yelahanka

7.0

5.

Banaswadi upto BMA Boundary

29.0

6.

Kengeri- BMA Boundary

9.0

7.

Yeshwantpur to BMA Boundary

14.0

8.

BMA Boundary – Hosur

12.0

9.

BMA Boundary- Ramanagaram

23.0

10.

BMA Boundary to Tumkur

50.0

 

Total

204.0

Corridors 1, 2, 6 and 9 are proposed to be taken up in the I Phase, while Sl No 3, 4, 5, 7 and 8 will be taken up in the II Phase. The Corridor at Sl No 10 upto Tumkur may be taken in III Phase.

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo | book