Skip to Content

Bangalore CTTP 2007

up
912 users have liked.
Comprehensive Traffic and Transportation Plan for Bangalore

TABLE OF CONTENTS

EXECUTIVE SUMMARY

CHAPTER – 1 INTRODUCTION (PDF 6MB)
1.1 GENERAL BACKGROUND
1.2 PHYSICAL CHARACTERISTICS
1.3 DEMOGRAPHIC AND SOCIO-ECONOMIC CHARACTERISTICS
1.4 TRANSPORT NETWORK
1.5 GROWTH OF MOTOR VEHICLES
1.6 THE BANGLORE METROPOLITAN REGION
1.7 URBAN LAND USE STRUCTURE FOR BMA
1.8 BANGALORE MYSORE INFRASTRUCTURE CORRIDOR AREA PLANNING AUTHROITY (BMICAPA)
1.9 EARLIER STUDIES
1.10 NEED FOR THE COMPREHENSIVE TRAFIC AND TRANSPORTATION PLAN

CHAPTER – 2 STUDY OBJECTIVES AND METHODOLOGY

2.1 STUDY GOALS
2.2 OBJECTIVES OF THE STUDY
2.3 SCOPE OF THE STUDY

2.4. STUDY METHODOLOGY

CHAPTER – 3 EXISTING TRAFFIC AND TRAVEL CHARACTERISTICS (PDF)
3.1 INTRODUCTION
3.2 PRIMARY TRAFFIC AND TRAVEL SURVEYS
3.3 TRAFFIC ZONE DELINEATION
3.4 ZONAL POPULATION
3.5 TRAFFIC CHARACTERISTICS
3.6 SOCIO-ECONOMIC AND TRAVEL CHARACTERISTICS
3.7 PEDESTRIAN TRAFFIC CHARACTERISTICS
3.8 PARKING CHARACTERISTCS
3.9 SPEED & DELAY STUDY
3.10 PUBLIC TRANSPORT SURVEY
3.11 TRAFFIC MANAGEMENT
3.12 ROAD ACCIDENTS
3.13 PROBLEMS AND ISSUES

CHAPTER – 4 DEVELOPMENT OF OPERATIONAL TRAVEL DEMAND MODEL (PDF)
4.1 INTRODUCTION
4.2 METHODOLOGY FOR MODEL DEVELOPMENT
4.3 TRIP GENERATION
4.4 TRIP ATTRACTION
4.5 BASE YEAR NETWORK DEVELOPMENT
4.6 GENERALIZED COST
4.7 CALIBRATION AND VALIDATION OF OBSERVED MODELS
4.8 CONCLUSIONS

CHAPTER – 5 STRATEGY FOR TRANSPORT DEVELOPMENT

5.1 NATIONAL URBAN TRANSPORT POLICY
5.2 GROUND REALITIES VS URBAN TRANSPORT POLICY
5.3 VISION
5.4 OBSERVATIONS
5.5 THE PREFERRED STRATEGY FOR TRANSPORT DEVELOPMENT

CHAPTER – 6 FUTURE DEMAND ANALYSIS AND SYSTEM SELECTION (PDF)

6.1 FUTURE GROWTH SCENARIO
6.2 DO MINIMUM SCENARIO
6.3 SCENARIO 2
6.4 SCENARIO 3
6.5 RECOMMENDED SCENARIO
6.6 SYSTEM SELECTION
6.7 SUGGESTED MASS TRANSPORT SYSTEMS FOR BANGALORE

CHAPTER – 7 THE TRAFFIC AND TRANSPORTATION PLAN
7.1 COMPONENTS OF THE TRAFFIC AND TRANSPORTATION PLAN
7.2 MASS TRANSPORT SYSTEM
7.3 THE METRO NETWORK SYSTEM
7.4 MONO RAIL / LIGHT RAPID TRANSIT SYSTEM (LRT)
7.5 COMMUTER RAIL SYSTEM (CRS)
7.6 BRT SYSTEM
7.7 AUGMENTATION AND IMPROVEMENT IN CITY BUS SYSTEM
7.8 INTEGRATED MULTIMODAL TRNASIT CENTRES – CUM - INTERCITY BUS TERMINALS
7.9 ROAD INFRASTRUCTURE
7.10 INTER-MODAL INTERCHANGES
7.11 NON- MOTORISED MODES
7.12 PARKING
7.13 FREIGHT MOVEMENT
7.14 DEMAND CONTROL
7.15 TRANSPORT SYSTEM MANAGEMENT - B-TRAC 2010

CHAPTER – 8 TRANSPORT INTEGRATION
8.1 NEED
8.2 INTEGRATION OF MODES
8.3 FEEDER SERVICES
8.4 INTER-CHANGE FACILITIES
8.5 OPERATIONAL INTEGRATION

CHAPTER – 9 COST ESTIMATES, PHASING AND FINANCING PLAN (PDF)
9.1 UNIT RATES
9.2 COST ESTIMATES OF PROPOSALS AND PHASING OF IMPLEMENTATION
9.3 FINANCING PLAN
9.4 FUNDING OF INFRASTRUCTURE THROUGH DEVELOPMENT, CONVERSION AND INFRASTRUCTURE DEVELOPMENT CHARGES

CHAPTER – 10 INSTITUTIONAL DEVELOPMENT (PDF)
10.1 REGIONAL PLANNING
10.2 AGENCIES INVOLVED IN CIVIC WORKS
10.3 ROLE OF VARIOUS TRANSPORTATION AGENCIES
10.4. NEED FOR UNIFIED METROPOLITAN TRANSPORT AUTHORITY
10.5 DIRECTORATE OF URBAN LAND TRANSPORT
10.6 BANGALORE METROPOLITAN LAND TRANSPORT AUTHORITY
10.7 TRANSPORT PLANNING UNIT (TPU)
10.8 TRAFFIC ENGINEERING CELLS (TEC)

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo | book