The Steering committee proceedings documents were provided by KSIIDC after the meeting between Praja members and Mr. Nagesh DyGM, KSIIDC on 13th Dec 2008. The documents were obtained from KSIIDC on the 2nd of January.
Steering Committee Proceedings (Meetings 01-10)
Steering Committee Proceedings (Meetings 11-17)
A note on the development of Bangalore Airport prepared by Mr Nagesh and original RPF document will posted shortly.
Comments
What's in Steering Committee Proceedings?
Prajagale,
First off all, many thanks to Ritesh and others for posting this important document that gives an insight into the making of BIAL project and how the BIAL came about. A comprehensive report has been written by KSIIDC MD, Mr Nagesh, which is available on Praja @ http://bangalore.praja.in/blog/rithesh/2009/01/16/bial-rti-airport-development-overview
But still there are many things that is not covered in Mr. Nagesh's report. After going through about 150 pages or so,I felt the need that I should summarized the contents and important points in this post for the benefit of Praja Community and other visitors.
Rest is the history and we all were witness to the BIAL saga therefater even after its opening in May 2008. There is no parallel to BIAL project, which I think has seen the most opposing views and close scrutiny from public including Praja members.
In the end I must thank Ritesh and praja community for standing upto Praja's legacy.
Syed
Thanks, Syed!
for coming to the aid of people like with me with attention deficit disorder and summarizing the meeting notes succintly.
Your point # 4 is significant. I thought I read a news report in the TOI print edition a couple of days ago that says that the Joint Parliamentary Committee of the Lok Sabha ( looking into HAL and Begumpet closures) believes that the contract called for keeping these airports open after the new airports came on line. There appears to be a disconnect here. I will look for this article again at home and read it again to make sure I have the facts correct.
Thanks Syed and Rithesh
Thanks for the RTI and the summary. This document (and this is black and white) shows clearly that the 150km rule came in much earlier than what we have been led to believe.
The other interesting thing to find out will be what changes did BIAL make sometime in 2006 after Praful Patel gave them feedback that their design was in line with growth and also did not have an "international" look. I know they did add 3 gates (8 vs original 5 planned).
Srivathsa
Drive safe. It is not just the car maker which can recall its product.
VVR, rhetorics with Convoluted facts!
VVR,
Nice to see your comments after a long lull from your side. The article you are referring to is from TOI, "http://timesofindia.indiatimes.com/Bangalore/HAL_airport_closure_violated_/articleshow/3995111.cms".
The anti-bial/pro-hal brigade's all these days without any hard facts on hand had tried to convince every one to believe with convoluted facts. Until, this report was obtained, we all were made to believe that the HAL closure and 150 Km exclusivity were introduced in 2005 after the CA was signed and was introduced scrupulously. The steering committee minutes are ample proof to demolish this fallacy and fact-less rhetoric.
What is needed now is to understand the justification for 2500 crores for the current BIAL airport in comparison with RGIA airport in H'bad? Truth about actual area of the terminal? It is claimed that BIAL is including basement footage also as part of the terminal and it s cover up operation by AAI, in their recent study of BIAL airport.
Also interesting would be Karnataka House committee report and follow up action from GOK. Time will tell whether a politician is politicia or some are better than others?