Skip to Content

Public Transport

7.13 Freight Movement

7.13 FREIGHT MOVEMENT

7.15 Transport System Management - B-TRAC 2010

7.15 TRANSPORT SYSTEM MANAGEMENT - B-TRAC 2010

7.8 Integrated Multi Modal Transit Centres –Cum- Intercity Bus Terminals

7.8 INTEGRATED MULTI MODAL TRANSIT CENTRES –CUM- INTERCITY BUS TERMINALS

7.7 Augmentation And Improvement In City Bus System

7.7 AUGMENTATION AND IMPROVEMENT IN CITY BUS SYSTEM

7.6 BRT System

7.6 BRT SYSTEM
BRT is one of the most cost effective public transport modes where the following two conditions can be met:
--Sufficient Right of way (30m or more) is available along the corridor to provide for exclusive carriage ways for BRT
--The peak hour commuter load is up to 20,000 phpdt.

7.5 Commuter Rail System

7.5 COMMUTER RAIL SYSTEM (CRS)

7.4 Mono Rail / Light Rapid Transit System (LRT)

7.4 MONO RAIL / LIGHT RAPID TRANSIT SYSTEM (LRT)

7.3 The Metro Network System

THE METRO NETWORK SYSTEM

7.3.1 Metro Corridors under Implementation:

7.2 Mass Transport System

7.2 MASS TRANSPORT SYSTEM

7.1 Components Of The Traffic And Transportation Plan

7.1 COMPONENTS OF THE TRAFFIC AND TRANSPORTATION PLAN

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo