Skip to Content

Madiwala Ayyappa Temple underpass opened

ಮೇಲೆ
265 users have liked.

 I am happy to see the Madiwala Ayyappa Temple underpass is opened for public from today 02-Aug-2010. I had indicated the start date in my Prajabytes here http://praja.in/en/statuses/259/ it was on 24-May-2010. Excellent, its almost complete in period of 9 weeks. I have not seen the completed work. But if I get a chance I will get pictures and post here.

ಪ್ರತಿಕ್ರಿಯೆಗಳು

silkboard's picture

9 weeks only, seems quick

ಮೇಲೆ
170 users have liked.

Good call Bheema. Yet another magic box project? Pictures anyone? 9 weeks only, seems like this was done on time.

sanjayv's picture

Constructed using Soil Nailing technology

ಮೇಲೆ
162 users have liked.

 Apparently, this underpass uses something called soil nailing.  I saw this in the Hindu here. The Hindu article calls this a state of the art technology.  However, the Wikipedia article on soil nailing (here) dates it to 1972.  The Japanese std on soil nailing was published in 1987 and the FHA (US) published stds in 1996 and 2003.  Does not sound like that much of a state of the art as advertized.

srinidhi's picture

its state if art for us..nevertheless

ಮೇಲೆ
178 users have liked.

 Clover leaf jn is an 'in' thing for us...though its an 'out' thing elsewhere..

So considering 20-30 years old tech being used..its still latest for us!

 

Anyways, hope the tech gives some meaning to the MUP projects and dont make them a makeshift solution..

sanjayv's picture

Was on this yesterday

ಮೇಲೆ
184 users have liked.

I was on (in?) this underpass yesterday.  It is only nominally complete.  Lot of finishing work to happen and the approach roads to the underpass are a mess.  Some of the "nails" appear to be sticking out from the concrete and needs to be trimmed/finished.

It also looks like the approach roads are going to be concretized.  I saw that the road from Madiwala check post to underpass is being made of Concrete.  The alignment of the underpass also somehow felt wrong (w.r.t road), but that whole area is a mess right now and I could be wrong.

The other interesting  thing from a quick reading of the  FHA document on soil nailing  is that it stressed on the experience of the contractor with the technology being important- to get it right.

idontspam's picture

Experience

ಮೇಲೆ
184 users have liked.

 it stressed on the experience of the contractor with the technology being important- to get it right.

That should nail it against the magic box company. 

ashok_n's picture

Madivala Underpass

ಮೇಲೆ
154 users have liked.

Hello,

There are some pictures in this forum:

http://www.skyscrapercity.com/showthread.php?t=1025435&page=18

The width of the underpass looks like it is 4-lane. So thankfully, it is not a magic box.

Anyway, congratulations to BBMP and the contractor (who??) to finish it this fast. For BBMP, after its numerous failures (Puttenahalli, Kadirenahalli, Tagore circle) to finish on time, this should be a shot in the arm. Hopefully, they can recreate this at other places (would love them to start from BTM - Udupi Gardens signal).

 

 

 

idontspam's picture

Good job

ಮೇಲೆ
176 users have liked.

 Congratulations to BBMP and the contractor (who??) to finish it this fast. 

I will clap for them. Good work is indeed appreciated.

Another good thing I noticed is how they are dumping the mud from the digging on Sanjaynagar main road onto a standing truck instead of on the sides of the road. 

Why oh why was this rocket science for so long? So have they suddenly matured in practices or its just a flash in the pan? Time will tell.

srinidhi's picture

pic on net..

ಮೇಲೆ
213 users have liked.

 

Being from the green brigade cant help but notice that last of the ficus trees which lined Hosur road has been cut..there was  a massacre when L&T built the new Hosur road..the tall majestic trees were uprooted to make way for the expressway..guess one or two are still left standing with limbs cut near Narayana Hrudayalaya hospital.. 

a2winit's picture

This is constructed in a time

ಮೇಲೆ
178 users have liked.

This is constructed in a time period of two and half months. The 7.5m Precast element has been designed In-house by BBMP Engineers. Congrats to all engineers and contractors. I got few photos of site after inauguration. This is really great compared to Kadirenahalli, Puttenhalli ( which are under going since last three years)

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo | blog