The Jayanagar TTMC was built with a swanky futuristic look but all what’s within is huge empty spaces and leaking walls and roofs. Almost close to completing a year now, all the promises are still on paper. Apart from the busy bus service in the basement, there’s been no progress within. A quick survey of the entire building reveals nothing more than empty spaces, unfinished structures and poor quality of construction. Even the flooring and electrical wiring have not been completed. The walls and beams have already given in to the recent rain. The unfinished wiring works on the first and second floors are now seen soaked.
At a time when there is serious shortage of parking space, this TTMC has a huge park and ride provision on the terrace with a capacity of nearly 110 cars. The original idea behind it was that people could drive in, park their cars/ two-wheelers and board their bus. But, with no lifts ready yet, people are forced to walk the entire ramp up and down to park and ride. According to locals here, weekdays hardly see even 10-15 cars parked here. Even on weekends, the numbers hardly touch 20.
May 2010
Praja.in comment guidelines
Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!