NMT CBD Pilot survey presentation to DULT by Praja.in. Next steps is for DULT to constitute a task force with representatives from CiSTUP, BBMP & DULT to prepare detailed plans.
NMT CBD Pilot survey presentation to DULT by Praja.in. Next steps is for DULT to constitute a task force with representatives from CiSTUP, BBMP & DULT to prepare detailed plans.
Comments
Bicycle markings
Meanwhile we have fiberglass cycle+double arrow stencils available. We can help with marking cycle lanes in your area.
Synergizing BPS and NMT
Nice!! Great attention to detail and irreplaceable on-the-ground observations. Good job NMT team!
We do however need to synthesize this with suggestions made in the BPS presentation in zones of overlap (as of now; Richmond & Residency Rds.).
---
TM
std mutcd size..
to add to IDS post..the templates are made around Manual on Uniform Traffic Control Devices (MUTCD) document issued by the US Federal Highway Administration..
The bike marking is approximately 1.2mtsX 2 mts
We do however need to
We do however need to synthesize this with suggestions made in the BPS presentation in zones of overlap
Agree, will go thru the BPS V9 and revert.
NMT & BPS
Went thru the BPS report. Since its focussed more on the signal jump, I dont see specific mention of Bicycle integration in the report but the NMT does take care of this as it is intended to connect the bus & train modes in the CBD area. Go thru the NMT report & let me know if you see any discrepancy.
synergies btw NMT & BPS limited..
since the proposed plan to have dedicated bike tracks in CBD..synergies will mostly be limited to junction treatments, which can be exclusive for bus and bikes..
but there will be an immediate need for sensitizining bmtc drivers to cyclists presense, since its more a raging bull and an ant story now..which needs to change..
Some points to note for
Some points to note for people who havent seen either reports
1) The bike stops are close to the bus stops in Richmond & Residency rd. so accesiibility from bus stops is not an issue.
2) The bike track will be on the opp side on Richmond rd (right) whereas it will be on the same side of the bus lane on Residency rd. (left)
3) On residency rd after Bangalore club there are only 2 stops, 1 near ashirvadam circle & another mayo hall. Bike track/lane at any bus stop need to merge with bus lane or run behind the stop. Bike track will merge into st marks road at cash pharmacy avoiding Bangalore club bus stop. Hayes rd can be used to connect to richmond rd instead.
4) Since jump lanes have been proposed on Dsouza & Vellara jn's in the BPS report both of which are on left side of the on Richmond rd. Bike lane will not be able to use these jump lanes. If jump lanes can be done on residency rd then bike lanes can also use this.
5) Bikes can avoid vellara jn by using castle street & kings street while the current alignment will not need bike track to cross Dsouza circle.
More NMT-BPS
Bikes can avoid vellara jn by using castle street & kings street...
A longer-term solution might involve purchasing a strip of land on the LHS (i.e. Sacred Hearts and Cathedral's/All Saints Church land) for the QJL so NMT can avoid the detour.
If jump lanes can be done on residency rd then bike lanes can also use this.
But ...based on sb's data for 335E/G1, Residency Rd was not among the top-4 slowdown points in the inner CBD. Having said that, a QJL somewhere (possibly Ashirvadam circle), is definitely worth thinking about.
Bike track/lane at any bus stop need to merge with bus lane or run behind the stop.
How about something like this (figure not to scale)?
---
TM
TM, IDS - add an annexure on integration in BPS paper
The BPS concept paper is focused on priority for Buses. We have purposefuly avoided going into other aspects of Bus transit to keep focus. But seems like it would be worth to add an appendix/annexure section on integrations.. We have left a placeholder already (see the very last page of the document), ned to fill in some of these with more detail.
TM/Venu if you read this, lets get going on it then. Lets produce a v10 of the BPS draft this weekend.
BPS paper- NMT only annexure?
Wilco...However the appendix on 'inter-modal' integration, AFAIU will only touch on NMT. Correct?
----
TM
Quick update DPR/details
Quick update
DPR/details study has been commissioned by DULT. Will be completed in about 3 weeks & a presentation will be made to the task force
more reasons for tracks..
more from TOI today here
The Real Reason Why
The Real Reason Why Bicycles are the Key to Better Cities
read here
How to Design a...
How to Design a Bicycle City
Read here
DPR's are done..arent they?
"The City will have a dedicated seven-kilometre cycle lane from M G Road to Baiyappanahalli by the end of this year, if everything goes as planned..
As part of the Rs 64-crore road upgradation project, the Bruhat Bangalore Mahanagara Palike (BBMP) and Bangalore Metro Rail Corporation Limited (BMRCL) will share the costs on a 50:50 basis to upgrade roads, footpaths and provide the cycle lane."
more here
They are again talking of a DPR but thought Tender Sure had already finished on this route..the funds are in place..its just abt implementation!
Get on guys!