Skip to Content

Road Works

Can road infrastructure ever keep up with cars?

Lots of noise is made about Bangalore not having enough infrastructure being the reason for our traffic troubles.  Here are some images from cities which have invested in more road infras

Bandra Worli Sea Link opens - any lessons for Bangalore?

Was watching TV in my Bombay hotel this morning.

Narasimharaja Bouleward - get architects, town planners to provide best plan

The City rulers , over the years , have proved grossly inefficient, by not taking steps to complete the Ring Road which would have absorbed the increase in traffic , especially of trucks and lorries. Let us not do another mistake by hurriedly deciding to cho off all trees.This has never solved problem any where so far.

New Road Design proposal

InfrastructurePedestrian Infrastructure

As some of you may be aware, we had started some work to improving road design standards. To this end, I had started putting some documentation together (still only 20% complete) .

Meet Mr Jai Prasad (BBMP) on Road Standards

14 May 2009 15:30
14 May 2009 16:00
Asia/Calcutta

We are planning to meet Mr Jai Prasad to discuss on Road designs in Bangalore. Agenda is:

Revamp of the Bangalore civic body.

Everything else

 Recently we discussed about high dividers and roads being made “Double roads” in a forum. The truth is that, the roads are two way traffic roads by default, to start with. Normally two way roads are made one way to take care of increased traffic density. There is sometime a need to iterate to satisfy the public demands.

Plan for ORR and marathalli junction

Hi,

Does anyone know plan on how ORR - Marathalli junction will be made signal free ? I could not find any post in Praja regarding this.

Recently I noticed that ramp from ORR (when you from KR Puram) to Marathalli bridge is being widened to 4 lanes road (two lanes on each direction).

Regards,
Subodh

Digging of roads and improper patch up

The roads in Whitefield-ITPL area were in reasonably good condition after the last asphalting and periodic maintenance works. However the good conditioned roads were spoiled by the pits digged (and left without properly filling/repairing) for laying pipe conduits (for fiber cable ?) underground.

BBMP elections, Outer ring road and Flyovers Underpasses

It seems the Rs 300 crs needed for 10 underpasses to raise money for which GoK formed a Land corp (sell encroached recovered Govt lands and was unsuccessful) in Oct 2008 has suddenly become 450 crs now to be used for 8 flyovers.

Roads in Nagarbhavi layout

Nagarbhavi layout is an old BDA layout. Except few blocks almost all blocks have large population. After forming the Nagarbhavi layout it seems this area is completly neglected by BDA and now by BBMP. Roads are in very bad shape. Recently only few main roads are tarred. It is very difficult to use vehicles on this roads.

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo