Of late I have seen an increase in the number of vehicles with Kannada number plates. This is illegal per the provision of rule-50, sub-rule-2 and proviso-D of Central Motor Vehicle Rules, 1989, which specifically states that letters on vehicle number plate should be in English and numerals in Arabic. The Government of India in a notification (No.SO. 444E dated June 12, 1989) issued under Section-41 (6) of the Motor Vehicle Act , 1988, also made these rules mandatory.

Part I: BRTS


Bus Rapid Transit System (BRTS)
Earlier (1999), a feasibility study for BRTS had identified a promising network of 20 corridors for bus routes comprising twin central rings intersected by 8 radial routes, with assistance from SIDA, Sweden. A pilot project of 12kms from Jayanagar to Shivajinagar with a combination of exclusive lanes with priority of passage at signals & construction of rapid transit lines was planned but never materialized & was abandoned without any attempt. There is no mention of this in the CTTP-2007 report, either. If this had commenced then, we might have seen it progress to some extent & at least, public opinion about the value of such quicker means of public travel would have been recognized.

bus ticket cost

i have small suggestions

the bus tickets issuedby BMTC may be in multiples of Rs 5 or Rs 10

but not odd figures like Rs6, Rs 13 , Rs 14 etc as this will cretae problem of change

Srinath Heragu

Part II: Non-Motorised User Facilities

Pedestrian Facilities
Excerpts from various sections of the CTTP report are as follows :
3.13.1.9: There is high pedestrian traffic in core area and some other areas in Bangalore. Footpath facilities are generally not adequate and their condition is deteriorating. Therefore up gradation of their facilities is very important.
5.5.8 (Preferred Strategy for Transport Development): Special facilities for pedestrians within the entire network specially in the core areas; Pedestrianization of selected shopping streets in side the core area going to be served by Underground sections of Metro; Provision of pedestrian sky walks, under passes, footpaths and other road furniture along the roads where necessary.
7.9: Recommends as many as 78 roads within ORR & 54 roads outside ORR for improvements & widening.
7.11.2.2 (Foot paths): Recommends a width of 2.0m for sidewalks for about 350 kms of city roads.

ನಾವೇನು ಮಾಡಬಹುದು?

 
ಕಳೆದ ವರ್ಷದ ನಾಟಕಗಳು ಎಲ್ಲಾ ಮುಗಿದು ನಮ್ಮ ರಾಜಕಾರಣಿಗಳು ಮನೇಲಿ ಬೆಚ್ಚಗೆ ಕೂತಿರೋದರಿಂದ ಒಂದು ಲಾಭ ಅಂದರೆ, ಸಾರ್ವಜನಿಕ ಕೆಲಸಗಳಿಗೆ ಅಡ್ಡಗಾಲು ಹಾಕುವವರು ಕಮ್ಮಿಯಾಗಿ ಸುಮಾರು ಕೆಲಸಗಳು ಬೇಗ ಬೇಗ ಮುಗೀತಾ ಇವೆ. ಹಾಗೋ ಹೀಗೋ ಬಿಡಿಎ ನವರು ಒಂದಿಷ್ಟು underpassಗಳು ಮಾಡ್ತಾ ಇದಾರೆ, airport ಕೆಲಸ ಚೆನ್ನಾಗಿ ನಡೆದು, ಜಾಸ್ತಿ ಗಲಾಟೆ ಇಲ್ಲದೆ ಮುಗಿದಿದೆ. ಒಟ್ಟಿನಲ್ಲಿ ನಮ್ಮ ನಾಟಕದ ಕಂಪನಿಗಳು ಇಲ್ಲದೇ ಇದ್ದಾಗ ಕೆಲಸಗಳು ಸುಗಮವಾಗಿ ನಡಿತಾ ಇತ್ತು ಅನ್ನೊದಂತೂ ನಿಜ.
 