[Updated, Oct 7: We have requested for Oct 18/19, or the weekend after that as some interested members are unavailable on Oct 11. Mr Sivasailam will get back after Oct 12, will post new dates once we get them]
Going by the Metro discussions here, recent and past, we got to meet with BMRC and understand station designs, studies on catchment area, integration with BMTC and more and ask some questions. How many are game for a meeting? Indicate your willingness via a comment on this post. Anyone who has contacts or connections already established with senior engineers or Directors of BMRCL, please send admin a message (via contact, or private message). Meanwhile, we will try to reach them directly.
Volunteers who want to help in organizing this meeting - making list of questions, working on dates with BMRC once contact is established - indicate the same when leaving your "I want to join" comment. As always, first come first serve, but if there is more interest than capacity, long time and regular members will get preference.
ಪ್ರತಿಕ್ರಿಯೆಗಳು
BMRC Meeting
I would certainly like to go for the meeting, but my availiability is after 15th/Oct. If the meeting is scheduled after the 15th, I request to be counted in.
I would also like to check with them about what provisions are being made for fast /efficient feeder buses. I fully agree with what Silkboard mentioned - that without a proper network of feeder services, the Metro may fail.
I also wish to check about the other feeder services planned - the monorail/s & also about inclusion of JC Rd /Corpn & Residency Rd /Richmond circle - these are vital points that seem to have been ignored in the proposed Metro /Mono alignments, so far.
Naveen
ITPL Area connection and BIAL connection
Meeting with BMRC
Am out of town till Oct 8
Srinath,
I am out of Bangalore from Oct 1 to Oct 8. Can't make any meeting. I have plenty of pictures of Singapore's MRT system. If I am in Bangalore when the meeting is scheduled, I would like to join.
Questions from my side
a. Why only 3 coach rakes to start with? The Metro should target much more ridership from Day 1.
b. Connectivity from stations to nearby areas. What is the plan?
c. RV Road terminal - what is the traffic plan around 40th cross? A residential area and so much traffic will lead to conflict.
d. Repeat M Cadambi - why is visible progress so slow? Delhi Metro is chugging along much faster.
Srivathsa
Drive safe. It is not just the car maker which can recall its product.
Am in
Suhas
Suhas
Lakshman Rau Boulevard!!!
I'll join if I'm back...
I'm in Singapore for the next two/three weeks. Will sure join in if schedules work out.
Thanks,
Ravi
No response yet
Station plans details - observations
Confirmed meeting on 11th October
Mr. Sivasailam has been kind enough to give us an appointment at 11 AM on 11th October. The meeting will presumably be at BMRC's office. Hope we all can make it.
-Admin
Have requested for next weekend (Oct 18)
Since a good # of old timer members are out or busy this weekend due to holidays, we have requested for BMRC's time next weekend. Will update as soon as we get confirmation. Please do leave your comment of interest (via PM or comment here), mention if you can do Oct 11 (current plan) as well.
mcadambi - ITPL, EC - very relevant yet unspecific question
Compliments on the question. Very relevant to Bangalore as a whole, and also not very locality specific.
The BCIC Infrastructure Committee with be hosting Mr. Sivasailam in our meeting on 16th. Can I use your question ? Will add Bommsandra and Jigani, with your permission. Bangalore is more than IT.
-----------------------
Regards
Devesh R. Agarwal
Visit my aviation blog at http://aviation.deveshagarwal.com
Regards
Devesh
Bangalore Aviation
Enjoy life, destroy FUD
Feel free to use any question
EC link in Phase II
Why no parallelization
..or prioritization?
BMRC Meeting
Hi All,
I can make it if the meeting is still planned on the 18th or anytime.
I agree with Vasanth - visibly, the work appears very slow along all reaches barring the MG Rd ~ Byappanahalli stretch (Reach-1). If they plan to have all sections in operation as scheduled, the pace of work has to improve considerably - there are sure signs of a delay if this continues. Tunnel boring is yet to commence & is a major obstacle that needs to be dealt with soonest.
BMRCL accepts too
"..The slow performance of the contractor(Navyuga) selected by the BMRCL is also an issue. At one stage, it was decided to even do away with the selected contractor and go for a fresh tender bidding process. But, there are issues involved in it. The BMRCL has issued instructions to the contractor to speed up the activity so as to complete the project as per deadlines set"
- DH 10th OCT
Meeting with BMRC
BMRC Meeting - When ?
metro update?
I am new here. i live in the hebbal area. Does anyone have any updates on phase-2 work after your meeting with BMRCL?
i am specifically interested in what they are doing in the hebbal area. is the lake going to survive this expansion?
thanks
Adarsh
Re: Metro Update
Phase 2 may complete by 2015 only. It will be between Yelahanka and Electronic City.
Hebbal may get the monorail as per original CTTP report. SCOMI Geodesic proposal does not contain Hebbal.