Skip to Content

Latest posts

7.6 BRT System

7.6 BRT SYSTEM
BRT is one of the most cost effective public transport modes where the following two conditions can be met:
--Sufficient Right of way (30m or more) is available along the corridor to provide for exclusive carriage ways for BRT
--The peak hour commuter load is up to 20,000 phpdt.

7.5 Commuter Rail System

7.5 COMMUTER RAIL SYSTEM (CRS)

7.4 Mono Rail / Light Rapid Transit System (LRT)

7.4 MONO RAIL / LIGHT RAPID TRANSIT SYSTEM (LRT)

7.3 The Metro Network System

THE METRO NETWORK SYSTEM

7.3.1 Metro Corridors under Implementation:

7.2 Mass Transport System

7.2 MASS TRANSPORT SYSTEM

7.1 Components Of The Traffic And Transportation Plan

7.1 COMPONENTS OF THE TRAFFIC AND TRANSPORTATION PLAN

Chapter–7 The Traffic And Transportation Plan

CHAPTER – 7 THE TRAFFIC AND TRANSPORTATION PLAN
The following are the sub-sections in this chapter:

Chapter–5 Strategy For Transport Development

CHAPTER – 5
STRATEGY FOR TRANSPORT DEVELOPMENT

5.1 NATIONAL URBAN TRANSPORT POLICY
5.2 GROUND REALITIES VS URBAN TRANSPORT POLICY
5.3 VISION
5.4 OBSERVATIONS
5.5 THE PREFERRED STRATEGY FOR TRANSPORT DEVELOPMENT

5.1 NATIONAL URBAN TRANSPORT POLICY

Chapter–8 Transport Integration

CHAPTER – 8 TRANSPORT INTEGRATION

Chapter–2 Study Objectives And Methodology

STUDY OBJECTIVES AND METHODOLOGY



about seo