Southern most station of Bangalore, Nayandahalli needs to be developed to offload the load on SBC. Currently, the people of southern Bangalore travelling towards Mysore need to go all the way upto City Station paying hefty amount to autos, stand in very long queues (sometimes miss the train because of not getting the ticket in time) and then take up travel. Hence most of the south bangaloreans take up buses from satellite bus stand.
Currently, there is no walk path from Railway station to Mysore road. People getting down in this station have to walk on the railway track till the next level crossing towards Bangalore side and then take up Auto. Second option is to walk through the slums next to the station till the Mysore road. It is very dark here and also it is not safe.
Express trains do not stop in this station. Only passenger trains stop. 1 minute stop even for express trains here will help lot of passengers of south Bangalore. There is only station building without any road connecting to it. A road of around 300 metres needs to be constructed connecting Mysore road to station with a prepaid Auto Counter. This will offload the passenger from SBC as well as make it convenient for the south Bangaloreans. In future as per the MRTS plan of Bangalore, this is going to become a transport hub with Metro rail and Monorail junction. This is the right time to act.