The 7 th of August 2008 , Near Benniganahalli Railway Bridge , K R Puram ,Bangalore - 36 Regarding the issue of Widening the road , Mr .N.S.Nandeesh Reddy , MLA ,K R Puram Constituency met with the public ,as they were protesting for the widening of road .
Mr .N.S.Nandeesh Reddy himself participated in the protest and called the NATIONAL HIGHWAY DEV AUTHORITY people and told that they will call a Tender for widening this road within this 25 th of August 2008 .
As he insisted the people regarding the issue , the public gathered took back the protest.
How about the bottle neck under the bridge
I am afraid by just widening the Beniganahalli railway under pass things are going to be worse at the KR Puram railway station under the suspended bridge. Widening the Beniganahalli railway under pass will result in traffic piling up faster in the subsequent bottleneck and will be result in utter chaos near criss cross just before the hanging bridge. As such it is already chaotic.
This area needs a comprehensive solution
Viva la magic box
The magic box, if fine tuned can be used to create a RUB similar to the one near Kumarapark / Nehru Circle.
Ideally, both the widening of the road under the KR Puram Railway Station bridge and Beniganahalli RUB should be co-ordinated.
Even assuming our consensual and democratic style of approach we should be able to get this fixed in about a year or so. God willing if there is a miracle, maybe even six months. If done sooner, i will shave my hair above my head in Tirupati! :-)
Finally something to Hope for Better
Co-ordinate change
There has to be a co-ordinated operation to increase the width of the Railway Underbridge as well as proportional changes near the KR Puram Railway Station.
I was coming back from Tirupati last night and saw the horror of the jam for myself while seated in a Bus. The road is wide on either side of the existing RUB but becomes smaller than even a gully road because the road is so damaged.
The Railways and NHAI are claiming that it will take 2-3 years to fix the problem. This is bull $hit. When China can build an olympic size stadium in three years then it does not take so long to complete the flaws in Benniganahalli and KR Puram Railway station.
We have to press on the area MLA's to exercise their whip on erriring officials in the NHAI and Railways. Only the MLAs can issue notices to the officials concerned.
Land acquisition is not a problem
There is not much high value land on either side of Old Madras road before the RUB unlike roads like CMH Road in Indiranagar and Mahakavi Kuvempu Road in Rajajinagar. Acquisition of land before the RUB and land after the existing RUB is also not a problem, provided there is will.
Modifying KR Puram Railway Station should be a priority.
I will write a detailed letter to the respective MLAs of that area.
benniganahalli
Redesign the parking lot of KR Puram
I had a chance to go through the KR Puram Railway Station bottleneck. It appears that the parking lot for autos and two wheelers are occupying more road space.
This has to be modified. There has been some land acquisition but more needs to be done w.r.t the parking lot of the KR Puram Railway Station.
Put an underground parking lot
take action or we will go for ROAD RUKHO
Benniganahalli Railway Bridge , K R Puram
Near Benniganahalli Railway Bridge , K R Puram ,Bangalore - 36 Regarding the issue of Widening the road , Mr .N.S.Nandeesh Reddy , MLA ,K R Puram Constituency has been promised that ill be call the people from NATIONAL HIGHWAY DEV AUTHORITY Tender for widening this road within this 25 th of August 2008 so what happend the issue,any improvement?
Benniganahalli Railway Bridge Protest , K R Puram
It's September 8th.
So what is happening.
Pedestrian Safety
Go For it...........
SAFE PASSAGE
benniganahalli bridge work underway..