Skip to Content

Meeting with BMRC (Metro)

up
168 users have liked.
Metro Rail

[Updated, Oct 7: We have requested for Oct 18/19, or the weekend after that as some interested members are unavailable on Oct 11. Mr Sivasailam will get back after Oct 12, will post new dates once we get them]

Going by the Metro discussions here, recent and past, we got to meet with BMRC and understand station designs, studies on catchment area, integration with BMTC and more and ask some questions. How many are game for a meeting? Indicate your willingness via a comment on this post. Anyone who has contacts or connections already established with senior engineers or Directors of BMRCL, please send admin a message (via contact, or private message). Meanwhile, we will try to reach them directly.

Volunteers who want to help in organizing this meeting - making list of questions, working on dates with BMRC once contact is established - indicate the same when leaving your "I want to join" comment. As always, first come first serve, but if there is more interest than capacity, long time and regular members will get preference.

Comments

Naveen's picture

BMRC Meeting

up
168 users have liked.

 

I would certainly like to go for the meeting, but my availiability is after 15th/Oct. If the meeting is scheduled after the 15th, I request to be counted in.

I would also like to check with them about what provisions are being made for fast /efficient feeder buses. I fully agree with what Silkboard mentioned - that without a proper network of feeder services, the Metro may fail.

I also wish to check about the other feeder services planned - the monorail/s & also about inclusion of JC Rd /Corpn & Residency Rd /Richmond circle - these are vital points that seem to have been ignored in the proposed Metro /Mono alignments, so far.

Naveen

ITPL Area connection and BIAL connection

up
179 users have liked.
Metro seems to connect Electronics City in Phase II but seems to ignore ITPL area and BIAL. Our Hon'ble CM proposed to connect Metro from Byappanahalli towards BIAL. These are the two questions that i'd like to ask BMRCL. I will not be in Bangalore around the time of the meeting. Second - why is the pace of work so slow? Third - why are heritage structures like the ancient home of master architect of yester years, Sri Komer Srinivasachar in VV puram being put under acquisition instead of other properties in that area? Soft targets I presume.
ssheragu's picture

Meeting with BMRC

up
178 users have liked.
ssheragu I am in touch with BMRC Mr. Sivasailam is now (at 11:30 a.m. on 1-10-2008) is attending a meeting. He willl be away till Monday (6-10-2008). I have asked Mr. Reddy in his office to provide some convenient dates so that we cam meet at a mutually conveneinet date. In the meanwhile is it possible for our overseas Praja brothers / members to provide some good designs of exquisite metros overseas and also provide other feedback, so that we use this during our discussions with him Thanks Srinath Heragu
s_yajaman's picture

Am out of town till Oct 8

up
187 users have liked.

Srinath,

I am out of Bangalore from Oct 1 to Oct 8.  Can't make any meeting.  I have plenty of pictures of Singapore's MRT system.  If I am in Bangalore when the meeting is scheduled, I would like to join.

Questions from my side

a. Why only 3 coach rakes to start with?  The Metro should target much more ridership from Day 1.

b. Connectivity from stations to nearby areas.  What is the plan?

c. RV Road terminal - what is the traffic plan around 40th cross? A residential area and so much traffic will lead to conflict.

d. Repeat M Cadambi - why is visible progress so slow?  Delhi Metro is chugging along much faster.

Srivathsa

 

Drive safe.  It is not just the car maker which can recall its product.

srkulhalli's picture

Am in

up
147 users have liked.
Key points : On Schedule : Can we make it more objective and visible. I remember one of the METRO people saying they met 45 out of 300 milestones or something. Can they put their tracking chart on their website, so everybody knows the precise progress. It will also put pressure on their leadership to deliver. On station design: My key concern, is do they have provision for parking (park and ride) and bus stops/ cabs/ autos. I think park and ride is very important to get better ridership. Can they share the station design with us, put it on the WEB for public to comment On routes: Can they consider extending phase 2 to BIAL. Also can we look at an at grade METRO on PRR right away

Suhas

Suhas

Arun's picture

Lakshman Rau Boulevard!!!

up
173 users have liked.
I would like to attend this meeting. Observing the developments over the last 4+ years, I have seen lack of transparency in most decisions. Also being too rigid has caused delays to the project. I would like to understand BMRC’s commitment to – • Protect Lakshman Rau Boulevard – how are they going to handle issues of parking, commercialization, etc • Possibilities of going underground or a shift to avoid the Boulevard (not too late I believe) • How are they carrying out the extension from Jayanagar – will it be towards BSK or Silk Board? Terminating a MRTS in the middle of a residential locality means tons of trouble.
Ravi_D's picture

I'll join if I'm back...

up
171 users have liked.

I'm in Singapore for the next two/three weeks. Will sure join in if schedules work out.

Thanks,

Ravi

admin's picture

No response yet

up
155 users have liked.
No response yet to direct emails sent from praja admin email. Folks would probably be out due to Dussehra holidays. Lets wait a week before trying other channels of contacting them.
silkboard's picture

Station plans details - observations

up
165 users have liked.
Pulled these out from http://www.bmrc.co.in/pdf/smp.pdf. See land area plan for R V Road Terminal R V Road station land Now, if you look at the station depiction, you are shown grass and garden next to the station. As per the land plan above, looks like the station will extend till the adjoining roads. So the picture can't be right. r.v. road terminal Similarly, its not clear if there will be work done to make bus bays at stations? Where would I get out of the station - on R V Road, or adjoining roads till where the station stretches? Any parking planned? If not, then I would expect buses to go in directions vertical to Metro line to take me deeper and farther into Jayanagar. How would that happen - via BMTC buses, or will Metro operate local shuttles like Delhi Metro is doing now (DMRC just ordered 300 more low floor buses)?
admin's picture

Confirmed meeting on 11th October

up
175 users have liked.

Mr. Sivasailam has been kind enough to give us an appointment at 11 AM on 11th October. The meeting will presumably be at BMRC's office. Hope we all can make it.

-Admin

admin's picture

Have requested for next weekend (Oct 18)

up
171 users have liked.

Since a good # of old timer members are out or busy this weekend due to holidays, we have requested for BMRC's time next weekend. Will update as soon as we get confirmation. Please do leave your comment of interest (via PM or comment here), mention if you can do Oct 11 (current plan) as well.

Devesh's picture

mcadambi - ITPL, EC - very relevant yet unspecific question

up
168 users have liked.

Compliments on the question. Very relevant to Bangalore as a whole, and also not very locality specific.

The BCIC Infrastructure Committee with be hosting Mr. Sivasailam in our meeting on 16th. Can I use your question ? Will add Bommsandra and Jigani, with your permission. Bangalore is more than IT.

-----------------------

Regards

Devesh R. Agarwal

Visit my aviation blog at http://aviation.deveshagarwal.com

 

-----------------------
Regards
Devesh
Bangalore Aviation
Enjoy life, destroy FUD

Feel free to use any question

up
176 users have liked.
Mr Devesh, feel free to use any question. My biggest concern, however, is not the connectivity to those areas (EC, ITPL), but the over all pace of execution. The Dubai Metro is progressing at a rocket's pace while we still struggle to finish reach one of Phase one.

EC link in Phase II

up
176 users have liked.
I saw a slide in the BMLTA summit that Namma Metro intends to provide a stop at EC on Phase II of the project. This can be confirmed during the meeting.
Vasanth's picture

Why no parallelization

up
150 users have liked.
Ideal way to execute these kind of projects is to start work parallely in many places. It has been 1 year since the MG Road work has started, but not even digging has started on the RV Road. Underground work which is the most time consuming portion has not been initiated still. Second question is why there is so much delay in selecting an operator for Monorail work. Progress has been nil on this front. Confirmation of HSRL or Normal Metro to BIAL. Why to wait for Phase 2 for connecting to EC. Why not start phase 2 parallely?
blrsri's picture

..or prioritization?

up
160 users have liked.
..we can easily see that the city market - majestic is one of the most busy routes, with most busses travelling btwn the two places.. It makes a lot of sense to have trains running btwn the two stns' Btwn we were talking of the disadvantages of the hub and spoke model for bus routes..doesnt the same apply for trains? Arent we re-enforcing the model using metro trains too?
Naveen's picture

BMRC Meeting

up
151 users have liked.

Hi All,

I can make it if the meeting is still planned on the 18th or anytime.

I agree with Vasanth - visibly, the work appears very slow along all reaches barring the MG Rd ~ Byappanahalli stretch (Reach-1). If they plan to have all sections in operation as scheduled, the pace of work has to improve considerably - there are sure signs of a delay if this continues. Tunnel boring is yet to commence & is a major obstacle that needs to be dealt with soonest.

 

blrsri's picture

BMRCL accepts too

up
172 users have liked.

"..The slow performance of the contractor(Navyuga) selected by the BMRCL is also an issue. At one stage, it was decided to even do away with the selected contractor and go for a fresh tender bidding process. But, there are issues involved in it. The BMRCL has issued instructions to the contractor to speed up the activity so as to complete the project as per deadlines set"

- DH 10th OCT

ashwin's picture

Meeting with BMRC

up
174 users have liked.
In case there are slots available, I am interested in coming for the meeting with the BMRCL MD.
Naveen's picture

BMRC Meeting - When ?

up
164 users have liked.
Hi All, What is the progress on this, if any ? Today's TOI reports that the E-W corridor is awaiting a DPR from DMRC for extension from Byappanahalli to Whitefield, & from Mysore Rd to Kengeri - possibly during Ph-2.
adarshh's picture

metro update?

up
201 users have liked.
Hello folks,
I am new here. i live in the hebbal area. Does anyone have any updates on phase-2 work after your meeting with BMRCL?
i am specifically interested in what they are doing in the hebbal area. is the lake going to survive this expansion?
thanks
Adarsh
Vasanth's picture

Re: Metro Update

up
184 users have liked.

Phase 2 may complete by 2015 only. It will be between Yelahanka and Electronic City.

Hebbal may get the monorail as per original CTTP report. SCOMI Geodesic proposal does not contain Hebbal.

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo | blog