Skip to Content

Recent additions to Gyan

BIAL Official Updates November 2007

BIAL began construction of the new Bangalore International Airport on 2 July 2005. The construction is progressing on schedule and BIAL will open the airport for commercial operation in April 2008.

Construction progress update for November 2007

Chapter–4 Development Of Operational Travel Demand Model

CHAPTER – 4 DEVELOPMENT OF OPERATIONAL TRAVEL DEMAND MODEL

Download chapter 4 external link PDF 374kb

Chapter–3 Existing Traffic And Travel Characteristics

CHAPTER – 3 EXISTING TRAFFIC AND TRAVEL CHARACTERISTICS

Download Chapter 3 External link PDF 630KB

Chapter–1 Introduction

CHAPTER – 1 INTRODUCTION

Download chapter 1 external link pdf 6MB

Chapter–6 Future Demand Analysis And System Selection

CHAPTER – 6 FUTURE DEMAND ANALYSIS AND SYSTEM SELECTION

See attachment (pdf 216.3 kb)

 

Chapter–9 Cost Estimates, Phasing And Financing Plan

CHAPTER– 9 COST ESTIMATES, PHASING AND FINANCING PLAN

See Attachment (pdf 186.75 kb)

Chapter–10 Institutional Development

CHAPTER–10 INSTITUTIONAL STRENGTHENING

See Attachment (pdf 79.65kb)

7.9 Road Infrastructure

7.9 ROAD INFRASTRUCTURE

7.11 Non- Motorized Modes

7.11 NON- MOTORISED MODES

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo