Bangalore has the dubious distinction of some of the worst implementations in infrastruacture..

  • Only city to have traffic signal in the middle of a flyover
  • Most flyovers have more traffic below than on the flyover
  • U-turn on a signal free road
  • Build underpasses without a need or a traffic study

The list is way too big..but adding to this list is one more change that BBMP has done..this is having..

  • 6 Humps on a single stretch of a flyover

This has been done on the mysore road flyover..initially when L&T implemented the project, one of the best implementations should say, they had joints at regular intervals with a rubber joint..

This was more to take care of the seasonal expansions and shrinkages and also to drain water..this was working well for many years and as all projects would need maintenance..this rubber joints also needed replacement..

lo..here enters our awesome 'engineers'..in order to save money on the maintenance contracts they started asphalting the joints..this would regularly give way because of the rubber below and they would patch it up again..

Now after all experiments..they have done the ultimate..they have put humps on these joints..6 of them each way..its a complete implementation with zeebra stripes and all..see below!

One other mistake they did with this was the timing..monsoon is a very bad time for road works..think Siddiah knows this very well..but they still did

Now traffic slows down hopelessly on this flyover just because of these dumb humps..and some of these humps have already lost shape due to the original rubber base below..

All in all they have achieved another feat in proving that BBMP can do innovations which can get into record books..albeit they proven as disaster!!

 

Comments

akauppi's picture

So there's no pedestrians there? (obviously)

up
143 users have liked.

This reminds me of a joke about "hölmöläinen" (Finnish for "dummers"), who do things like extend a carpet by cutting a piece from the other end... There's plenty of those in our folklore but we try not to behave like it today.

Such stupidity is really not having any grounds in today's world. We need smart solutions. And smart enough people. And smart enough managers. And politicians (...the list goes on).

Now that Praja works as a "citizen police" to highlight such idiotic occurances, you have half of the feedback loop. The other half is to get the city officials / transport planners involved, and *participating* on this very site. Can you accomplish that?

-asko

- asko

We're developing a light weight automated transport solution, especially suitable for Indian urban challenges. Initially launched in April 2010 in Delhi, we're progressing with CAD design and strength simulations in 2011

idontspam's picture

 Can you accomplish that? We

up
165 users have liked.

 Can you accomplish that?

We have already, people who have nothing to hide and truly care to listen are already listening/reading. Others are busy making money on useless projects with no outcomes, so sensible stuff can be given a go by. 

We have a newsletter that we send, maybe we can send it to BBMP as well. 

its a complete implementation with zeebra stripes and all.

Who in his right mind takes a walk on a flyover with no destinations on it? Secondly who will cross over to the other side in the middle of the flyover & what for? Why do you need to slow down traffic 6 times on a flyover sending shockwaves and causing backups? On the other hand there are stretches on the surface where people cant cross at all !!! Where are the zebras & horses on the surface?

mp's picture

Missing item from your list of "einstein-ish" ideas...

up
173 users have liked.

At least two Bangalore roads where the traffic direction is reversed. ON both these roads you are expected to drive on the right side of the road. In fact this has caused the ridiculous situation that in one of these roads the bus stand is on the median because the bus doors open on the median side and not the pavement side. 

 

ramesh_mbabu's picture

There was a maintenance tender worth ~ 12 crores

up
166 users have liked.

I could not get the exact details about the tender, but the total amount was around 12 Crores. Refer http://tenders.indiamart.com/details/813556737/ . Did not know that these 12 Crores is for a pair of humps.

srinidhi's picture

12 crores is atrocious

up
164 users have liked.

@Ramesh : thanks for the update

btw 12cr for a small useless job like this is really atrocious..I have seen before that while asphalting roads the contractor gets a trolley load of asphalt in the evening for ppl who want personal humps in front of their houses and these humps(illegal ofcourse) used to cost 1,000 Rs..some time ago that is..

Now considering cost escalations..the job on the flyover should not have costed more than 1L..max..

12 crores is mindblgling..is some one from the press listening??

idontspam's picture

12cr for a small useless job

up
149 users have liked.

12cr for a small useless job like this is really atrocious.

This is how the people are swindled, hard earned tax going to peoples pockets. Most of these projects are essentiallworthless in terms of outcomes, some like these are actually counter productive, & exist only to allow people to make money on some pretext. Doesnt this amount to robbery under IPC? or atleast cheating? 

murali772's picture

total scam!

up
193 users have liked.

For Rs 12 cr, I am sure L&T would have done a total repair of the joints and brought it back to original shape, and on top, given a guarantee for 10 years. This is a total scam.

Perhaps, we need to do an RTI exercise, as a PRAJA project, and expose more details.

@ IDS  -  game?

Muralidhar Rao
sridharraman's picture

Zebra crossings & humps for pedestrians

up
174 users have liked.

I am not too sure that what the BBMP has done here is really wrong.

I have seen people waiting on the flyover to catch buses going to/from Mysore.  So, obviously, people are walking up the 2 exit/entry ramps on to the main flyover and get on to the buses.

Given a day's observation, I am sure we can find out more use-cases of pedestrians on the flyover.  And frankly, I don't have any problem with the traffic slowing down ON the flyover.  The biggest issue in Bangalore is supposedly "slow traffic".  This is a quasi-state created by roads letting vehicles go at 80 km/h and having to "slow down" to 40 km/h.

On the other hand, if vehicles are "forced" to go at these lower speeds, it automatically makes for a safe and "uncomplained" road.

jsvasan's picture

BBMP's DON'T Fly over but Crawl Campaign!

up
161 users have liked.

BBMP's DON'T Fly over but Crawl Campaign!

idontspam's picture

RTI

up
191 users have liked.

@ IDS  -  game?

Absolutely, I will get a set of questions ready & we go after this. I know Sri uses this stretch everyday, rest who understand this foolishness can pitch in with questions.

srinidhi's picture

footpath for peds?

up
186 users have liked.

@sridharraman I am not too sure you know about the 'stopping' bus thing on the flyover. Essentially there is only one illegal stop at KR market..this is for the following bussses:

1. BMTC red board busses from Kengeri side 'skipping' KR market stop below the flyover...by not going down the flyover to avoid traffic

2. SURMS and other pvt carriers comming from Kollegala/Chamarajnagara and other places

3. TNSTC busses starting from satellite station stop occassionally to pickup passengers

Nowadays there is a traffic cop almost everyday haplessly trying to note down bus numbers which violate..when there is a cop..its just the BMTC busses which violate..'naanu govermentu neenu govermentu' logic

So in all its only the BMTC which keeps violating and drops off passengers on the flyover..hence according to your logic only one hump is needed to slow down the vehicles..why 6?

Hovever the humps were never put for peds at all..as said before and as said in the tender..its for the joints on the flyover..

Again if we want peds on the flyover..why not spend more and have a full fledged footpath and a bus bay for them? We will have one more unique feature then of having a legal bus stop on a flyover and a complete footpath to show that we care for peds..it will surely go into the records..

idontspam's picture

What project is this now?

up
168 users have liked.

Face-lift of the flyover includes two parts, replacement of the present modular expansion joints with finger-type expansion joints and re-asphalting of the same. It is said that finger-type expansion joints lasts longer. Replacement of expansion joints is estimated `2.66 crore, while asphalting of the road is estimated to cost `1.6 crore. “Once the expansion joint works starts, we will under take asphalting work too simultaneously. “Work is expected to start by end of August or September first week,” he added

Source

srinidhi's picture

finger type joints are needed..

up
167 users have liked.

these are the ones needed..web gives ref to lot of chineese mfrs of these..

they mention of asphalting..hope they dont mess up laying a layer of asphalt over the existing road..

sridharraman's picture

Why not?

up
139 users have liked.

@srinidhi, I would gladly accept any number of humps on a flyover if it helps in keeping the vehicle speeds within reasonable limits.

So, the problem is in not having "legal" bus-stops on the flyover.  I wish that happens as well.  After all, why exactly should private vehicles "skip" the traffic and as a consequence cause more congestion once all the lanes merge below.

idontspam's picture

 I would gladly accept any

up
165 users have liked.

 I would gladly accept any number of humps on a flyover if it helps in keeping the vehicle speeds within reasonable limits.

How do you know these 6 are achieving the desired effect? What should be the speed limit on this flyover & why?

 After all, why exactly should private vehicles "skip" the traffic and as a consequence cause more congestion once all the lanes merge below.

Why not? If you want people to take buses they should be accessible to pedestrians on the surface. Why should people trudge all the way up the flyover? The very reason public transit is using the flyover means they are not being people friendly. Root cause of people on the flyover is they need to access something that is not available below, Buses.

Its all nice to hate private transport, what with the ped walk & all, but it will be better to demand the right things with the right reason. Road humps are not even a pedestrian solution, raised pedestrian crossings are.

dvsquare's picture

Humps are not at all solution for ped crossing

up
179 users have liked.

Even Mr. Sood has mentioned many times that humps are not at all solutions for ped, not even an aleternative.

The questions here are -

(1) 12 cr, is that reasonable?

(2) Zebra crossing? I mean, is that really for crossing peds? or what was the motive behind?

(3) When BBMP can't do something constructive and great for namma bangalore, why in damage mode for some good things being done by BBMP?

(4) Ped stop on flyover, yes if you want that, make it legal with proper accessibilty and proper bus-bays, otherwise its not helpful for peds, but its causing risks to their life instead. I have lot written about that here.

(5) Even humps are not actual solution for speed limits, people wil still drive to their max in between the humps, how are they helping here? Instead install keep speed guns on the way (on bays), and later fine the people while exiting from the flyover or through posts.

@Murali Sir, @IDS

I am also in to get the details exposed. Let me know as well if I can be of help in the RTI exercise or any related task.

Deepak

sridharraman's picture

Pedestrian crossings without speed-breakers are pretty useless

up
168 users have liked.

In my experience, vehicles haven't stopped voluntarily at any pedestrian crossing.  They only do so if they are forced.  And currently, the solution present on our roads is humps.  It may not be the best solution, but until the authorities come up with them (whatever that is), there is no need to remove these humps.

idontspam's picture

And currently, the solution

up
179 users have liked.

And currently, the solution present on our roads is humps. 

There is no proof that a road hump has helped pedestrians more than a raised pedestrian crossing has. Further there is no proper reason for the presence of both pedestrians & road humps on the specific flyover in question. Apparently the cause of pedestrians reaching & boarding buses is mixed up in the revengeful clamour to see private traffic suffer. More importantly if these road humps were a solution in lieu of finger joints I should say this is a scam in the offing as per the news report above.

srinidhi's picture

speeds on this flyover..

up
183 users have liked.

been using this flyover since the say it was opened for traffic..it was like my personal for the initial few years and I did 100+ cosistantly on my yam and then the traffic slowed down after 2004-05..

now in peak hour traffic its not more than 50 (before the humps)

I still dont understand why are we talking of peds on a flyover..the whole thouhgt is wrong in the first place!

dvsquare's picture

Correct Sri, the ped thought is itself not fair

up
196 users have liked.
Peds on the flyover is totally unfair, why would one just allow ped crossing on the flyover, without thinking about it's implication. If they want to allow it in first place, first give bays for buses to stop on flyover, provide bays for peds, arrange other things for their safety and security, and then talk about those peed crossings and humps. Before doing all that we should't just discus half solution for peds, it's totally unfair and invalid. Deepak
kbsyed61's picture

Pedestrian safety Saleem’s priority

up
159 users have liked.

“In an effort to make pedestrians feel safe and secure, greater efforts will be directed towards evolving a pedestrian-friendly traffic system,” he added. Illegal humps will be converted into high rise pedestrian crossings after holding due consultations with the BBMP, said Saleem, the new ACP (Traffic and Security).

Source - Deccan Herald

ravi.megharaj's picture

Will the authorities take any action this one!!!

up
172 users have liked.

I am a regular traveller on this road and it is absolute nightmare riding on a two wheeler. There are more than 6 humps on either sideof the road. There is a hump every 100 meters. This will lead to slowing down of vehicles and as it is the traffic is heavy during mornings and evenings.

Also the whole road has to be asphalted. There is no maintance watsoever.

The plants pots have also been removed now on the divider....absolute shit...

We tax payers have got used to 'Adjust Madi' mode...

Its high time we have to revolt against the daylight criminals who take money and dont do there jobs.

Adding to this is road widening between floover end to tollgate bus stop..it is just about 300 meters streach and work is continuing since past 1.5 years...

 

Really frustrating!!!

srinidhi's picture

humps get patched up..

up
147 users have liked.

after the recent rains..most of the humps had come off, making the ride on this flyover a horrible experience especially for two wheelers..as ravi mentions above..

now they have patched up the humps again..oblivious to the fact that it will not stay intact because its been laid on a moving rubber base..

SO this is where the 12 crores is being used..that is a small fraction of it!!

The agenda from BBMP is to never go for any permanent solutions..the more temporary it is..the better it is to swindle money on the pretext of it!!

akauppi's picture

Sigh..

up
158 users have liked.

Sad to hear these "news".

Obviously there is a systemic problem with infrastructure maintenance in Bangalore.

I was thinking of suggesting a Google map with pointers to these locations to be fixed, but that would demand people and organizations actually being *capable* of fixing them. That seems to be the primary issue.

This only adds to my dislike of flyovers as a "solution" to urban transport problems. 3D cities is the right way to go, but not with last century technology, nor mindset.

What India needs is a full sold-as-service approach, where the original maker of the infra is also the one taking care of the maintenance, at its own cost (included in the whole bid for make the stuff). Indian companies *are* good in management and cost reduction. This simply must be extended to the infra building (and maintenance) and not only mobile phones, IT etc. intangible things.

Inpatient to get seed funding to my company. We would be doing exactly the above. :)

- asko

We're developing a light weight automated transport solution, especially suitable for Indian urban challenges. Initially launched in April 2010 in Delhi, we're progressing with CAD design and strength simulations in 2011

ravi.megharaj's picture

praja

up
167 users have liked.

How does discussing these issue solve the problems?? Is Praja.in influential enough to penetrate this to the concerned authorities or are we just putting out our frustration into this site..pardon my language..Im new to this portal and was curious if there will really be any action after these series of discusssions / ideas from citizens?

idontspam's picture

 Is Praja.in influential

up
168 users have liked.

 Is Praja.in influential enough to penetrate this to the concerned authorities or are we just putting out our frustration into this site

Yes & No, the site is just a platform which allows people to gather information & solution ideas. Praja RAAG is an offline entity which picks up certain ideas & takes them mainstream by advocacy.  

Activism of specific agendas is left to "The Praja" which is the citizens like yourself. The power is in you & not in the entity called Praja.in If you think somebody is going to fight on your behalf you are mistaken. If you need people who want to take up an issue you may find them on this site. Feel free to lead or join someone who is leading. Complaining about an issue is encouraged as long as a solution that can be advocated follows by someone or the other. No garuntees that all issues discussed or complained or solutioned will lead to activism as well.

So how do you lead on this issue? Start by asking what is the next actionable step? You will get gyan. It could be gathering more information, then contacts, then petitions, then meetings, then campaigns. Use the site to gather information, bounce approaches, discuss ideas, get second opinions, devils advocates are plenty (including me). Hope this helps.

idontspam's picture

Joint pains

up
179 users have liked.

The poor maintenance of Sirsi flyover has made it unsafe for commuters, what with an expansion joint lying in disrepair even though the deadline to fix it has expired. Source

There you go somebody is atleast noticing after a minor incident... I think it will be fixed only if something fatal happens or the protest happens I hope its the latter & not the former.

sanjayv's picture

a different perspective

up
156 users have liked.

This article (and there are several other sources, incl You tube videos) shows how with a different perspective, some organizations around the globe are able to do things faster for the same cost.

http://www.nytimes.com/2012/04/18/us/rapid-construction-techniques-transform-infrastructure-repair.html

srinidhi's picture

work started..stopped

up
176 users have liked.

The joint replacement work started about 4 weeks ago..the stopped the lane from the church junction to sirsi circle..the joints were dug up..

and then everything stopped..now everyday there is one guy on a chair sleeping in the morning..guess hes the security guard..

no other workers in sight neither any work is happening..

Why do they do this?

This looks like the specs were incorrect in the tender or the contractor did not do his homework..

either ways..road users are troubled big time by this work/impasee now..

ravi.megharaj's picture

Sheer Redtapism

up
159 users have liked.

I agree with Shrinidhi...It been around a month but just one of the humps is being worked on...moreover this has been dug and no work progress wahatsoever....still around 7 to go...after this mission they will also have to fix the humps from KR Market to church circle....this looks like a major 5 year project...its a shame!!!

This road connects to some of the major hospitals and its sad to see Ambulances getting stuck in traffic due to this...

 

ravi.megharaj's picture

KR Market flyover reopened but in vain

up
162 users have liked.

Today embarks another example of "History Repeats". After a month's work of maintenance, KR Market flyover again has "Humps"..this time much bigger ( guess lot of money spent on this mega structure)....Its a SHAME!!! Tax payer's money is being used for gambling...no one to take the accountability

I think in this time we will have to come together and protest against such nuisance..Its ridiculous that in a major city of Bangalore it has become "mission immpossible" for the authorities to fix this flyover..

 

Pls think about this seriously and we can all come together and protest on the flyover..

srinidhi's picture

finger joint replaced..

up
170 users have liked.

The humps on the mysore road flyover woes continue..was in the press too today..

However I think there is some light at the end of the tunnel..I noticed that they have replaced one of the joints (at it hits down just after sirsi circle). This is a metal finger type joint..looks pretty stable..

Now they need to replace the rest of them on the flyover soon..and remove the scary super humps on this road..btw the tar is already displaced on the many humps making it really bad now cos of rains!

Can BBMP take this up on a war front!?

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!