Skip to Content

Skywalk near EGL campus on Inner Ring Road Domlur Junction

up
356 users have liked.
InfrastructurePedestrian Infrastructure

As we have talked a lot about public transport as well as pedestrian friendly infrastructure, many of Prajagalu's must be aware of the fact that thousands of people cross the road in front of EGL campus/DELL office on Inner Ring Road, Domlur. Still there is no safe way and no right of way for the pedestrians. We advocate for use of public transport but think of people coming by buses and putting their life in danger and extreme risk while crossing the road in front of EGL campus. Vehicles coming at good speeds (with no fault of theirs) can also be victims of the same. I have discussed the same with Mr. Sood about possiblity of the skywalk or footover bridge on this place, and he told that BTP has advised/referred to BBMP long back about the need of foot-over bridge over here but after that nothing has happened so far and everyday a lot of people are just crossing the roads believing their fate.

Mr. Sood has sent a letter to me, which I attached here as well, it has some details about the foot-over bridge permission, reference etc.

Since, its written in kannada and I don't know how to read, I need some help here. I tried to get help from a few friends, but since its too formal and pure kannada that even they couldn't help me much.

(1) Please help me with the content

(2) How can I approach BBMP (or the concerned authority) to get this work done?

(3) Do I need to file RTI to find out why its getting delayed (I can ask question about the status, start and completetion date etc)

Or, any other suggestion to make this foot-over bridge reality soon, please come-up with the practical suggestion.

Deepak

EGL Skywalk - Bbmp Letter 002

Comments

idontspam's picture

BTP to build it

up
199 users have liked.

BBMP has accorded permision to build it on BOT model for 5 years initialy extendable to 25 on gok permission & passed the ball back to BTP. BTP is expected to submit a plan/map and proceed with building it. Sood has instructed Ulsoor PD to get it done fast ( this is in english). Congrats, you may get the overpass. Check with Ulsoor PD, and make EGL throw you a party. Praja will take treat from you later. Looks like this request has been pending from 2004.

dvsquare's picture

So, ball is in Ulsoor PD right now?

up
191 users have liked.

Ya, I read that part where Mr. Sood is asking to Ulsoor PD to get it done.

Also there is a mention of "Vantage Advertizing", what is that for? Do they also supposed to do something? Are they also involved in delay?

Shall I write directly to Ulsoor PD?

Deepak

Ravi_D's picture

Letter is addressed to the ad company...

up
194 users have liked.

... not BTP. BTP is only on the CC List. BBMP is asking the Vantage Ad agency to draw up plans, get it approved and build it.

dvsquare's picture

So, need to follow up with Ad Agency or ?

up
184 users have liked.

So,

It means, I need to follow up with the Ad Agency or with the govt authority, whom this Ad agency has to submit the plan and get it approved? I can ask govt agency as why they are not making Ad agency to do it fast, what are they waiting for ?

The govt agency whom they report to, will be BTP right? Ulsoor PD right?

Deepak

idontspam's picture

The govt agency whom they

up
179 users have liked.

The govt agency whom they report to, will be BTP right? Ulsoor PD right?

Ulsoor PD has been asked by BTP to coordinate the installation but the transactions of plan submission & approval and commercials will be between Vantage & BBMP. So you can start with speaking to somebody in Ulsoor PD with a copy of this letter.

dvsquare's picture

I have got the following info

up
176 users have liked.

I have got the following info from Bangalore Traffic Police contact-us page -

Police Inspector Traffic
Ulsoorgate Police Station
Email: hgatetrafficbcp@ksp.gov.in 22942660
9480801106

 

Police Inspector Traffic
Ulsoor Police Station
Email: halasoortrafficbcp@ksp.gov.in 22942659
9480801815

 

Shall I contact one of the above? By e-mail?
(Sharing any previous experience of Prajagalu in talking with any such people will be helpful, let me know the process)

 

Deepak

dvsquare's picture

Any more info from Prajagalu's on this?

up
186 users have liked.

Do anybody have any previous experience regarding the similar things, writing a letter to above 2 address (email plus registered-post) should be a good start? or suggest something else?

What should be the next to make it actually happening once its heard?

Deepak

murali772's picture

walk in the sky

up
189 users have liked.

I suggest you make a trip to Ulsoor Traffic Police station, and try to meet the DCP/ ACP in-charge, taking the letter from Mr Sood along with you. The letter will ensure that they take you seriously. Thereafter, the follow up can even be on phone. Give me a call. I can go with you.

It may also be a good idea to involve the local Corporator.

The only problem is you'll have a FOB just like the one beyond the Indiranagar fly-over, or the one near the Sophia high school (check this), which are more advertiser-friendly than pedestrian-friendly.

Muralidhar Rao
dvsquare's picture

Met ACP, Traffic, East, Wrote mail to Vantage Advertising

up
188 users have liked.

Murali Sir and I have met with the ACP, Traffic, Bangalore-East and showed him the copy of the letter I had. He advised us to write and talk to Vantage Advertising people and also to tell them that he wants to extend his full support for the construction of the skybridge. Murali Sir has written a mail to the contact people in Vantage Advertising and we are still awaiting response.

Deepak

murali772's picture

pro-activeness on the part of traffic police

up
190 users have liked, including you.

Last evening, Ms Geetha, Inspector, Traffic, Ulsoor sub-dvn, called to say that her effort at contacting the agency had not quite borne fruit, and to ask if I had made any progress in the matter. I stated what I had done, and that I will call them up today. I got through to the office this morning. They have seen my mail, and a certain Mr Harry Benedict (presently out of the city) is supposed to respond to me soon.

Whatever, with the new pro-activeness of the traffic police in the matter, I expect some positive outcomes soon.
 

Muralidhar Rao
dvsquare's picture

That's great Murali Sir

up
189 users have liked.

That's a good stuff coming up from  govt agencies. I am glad to know that.

Lets put a lot of pressure on the Vantage folks and get this moving.

Deepak

murali772's picture

well, it's live

up
172 users have liked.

Harry Benedict, Manager-Operations, Vantage Advertising Pvt Ltd, has finally responded as below:

Dear Mr.Muralidhar,
 
This is refers to your Mail regarding foot over bridge near Dell, we would like to inform you that we are always interested in the project and also we would like to bring to your notice that we are facing few issues to start the work:
 
1. There are 11kva line on  both sides of the foot path and also a transformer opp Dell which needs to be shifted. We have communicated to the BBMP and in return they have also written to the Bescom, unless this is cleared we are unable to start even the foundation work.
 
2. Our file is in the BBMP council which has gone for approval, we are expecting it to be cleared by the Council in this monthly meeting which scheduled to be held by this month end.
 
So please kindly bear with us and we will inform you the progress by this month end.
 
Regards,

I have additionally requested Mr Sood to use his good offices to further the matter with both BBMP as well as BESCOM. If any one knows the local Corporator for an additional push at BBMP, it'll certainly help.
 

Muralidhar Rao
dvsquare's picture

If nothing fruitful happens, shall we write to BESCOM?

up
195 users have liked.

Murali Sir,

As the first point above says the trasformer shifting, then going by the Mr. Manivanan Sir's comment here, we can ask about the BBMP request for shifting transformer to BESCOM? Or If already reqested, what is the status?

Also,

Isn't it possible or rather feasible/practical from BBMP perspective that skywalk's current proposed location can be shifted a little here or there so that transformer doesn't come in between, or that itself a painful and ongoing process with BBMP?

Deepak

murali772's picture

work through police

up
198 users have liked.

@ Deepak  -  Do check with Ms Geetha, Inspector, Traffic, Ulsoor sub-dvn, on 94808 01815. She is co-ordinating from the police side.

Muralidhar Rao
dvsquare's picture

Called Ms Geetha, Need to meet with her for further plans

up
176 users have liked.

Murali Sir,

I called up Ms Geetha, and she told I have to go and meet her to chalk out the plan. She said she is new and also trying to get hold of things around her.

Deepak

Praja.in comment guidelines

Posting Guidelines apply for comments as well. No foul language, hate mongering or personal attacks. If criticizing third person or an authority, you must be fact based, as constructive as possible, and use gentle words. Avoid going off-topic no matter how nice your comment is. Moderators reserve the right to either edit or simply delete comments that don't meet these guidelines. If you are nice enough to realize you violated the guidelines, please save Moderators some time by editing and fixing yourself. Thanks!



about seo | blog